Certified Genetic Counselor Exam Prep
Free practice questions

Free CGC Practice Questions

10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.

Start the free practice test → ★★★★★4.9/5 from 2,400+ candidates · No signup

These 10 free CGC questions are organized by exam domain, so you can see how each part of the Certified Genetic Counselor blueprint is tested. Reveal the answer and explanation under each question.

Domain 2: Risk Assessment and Principles of Human Genetics and Genomics (32 questions / 18.8%)

Question 1

A pay application shows $620,000 of completed work, $80,000 of eligible stored materials, 10% retainage on both, and $525,000 in previous payments. What current payment is due?

Show answer & explanation

Correct answer: D - $105,000

Domain 4: Counseling Skills, Communication, and Education (30 questions / 17.6%)

Question 2

A contractor's monthly WIP schedule shows earned revenue to date of $3,240,000 and billings to date of $3,410,000. The cost-to-cost percentage complete has already been verified. How should the $170,000 difference be reported?

Show answer & explanation

Correct answer: C - As an overbilling and contract liability

Question 3

A contractor's estimated project cost is $800,000. An estimator multiplies the cost by 1.20 and reports that the resulting $960,000 price provides a 20% gross margin. Which statement correctly evaluates the estimate?

Show answer & explanation

Correct answer: C - $1,000,000 is required; a $960,000 price produces a 16.67% margin.

More CGC practice questions

Question 4

Concrete for a structural slab has f'c = 4,000 psi. The testing report states that the arithmetic average of three consecutive strength tests is 4,080 psi and the lowest individual strength test is 3,620 psi. Under common ACI 318 acceptance criteria, which conclusion is supported?

Show answer & explanation

Correct answer: A - The results satisfy both stated strength criteria.

Question 5

During an occupied renovation, the architect issues a properly authorized Construction Change Directive requiring an additional temporary dust-control enclosure. The parties have not yet agreed on price or time, and the contract uses an AIA A201-style change mechanism. How should the contractor respond?

Show answer & explanation

Correct answer: D - Proceed, track the cost and time, and use the contract adjustment process.

Question 6

A competent person inspects a 4 ft 6 in-deep trench and finds no indication of a potential cave-in. Employees enter from one end, and the nearest ladder is 38 ft laterally from the work area. What correction is required before work continues?

Show answer & explanation

Correct answer: B - Add or relocate safe egress so lateral travel is no more than 25 ft.

Question 7

On a Florida private project, a material supplier contracted directly with the general contractor and has no direct contract with the owner. The supplier first furnished materials 32 days ago, and the owner has not made final disbursement. Which action best preserves the supplier's standard construction-lien rights at this stage?

Show answer & explanation

Correct answer: D - Serve a Notice to Owner now, before the 45-day period expires.

Question 8

A Phase I environmental site assessment for a proposed warehouse identifies a former dry-cleaning operation as a recognized environmental condition. The owner now needs to determine whether soil or groundwater contamination is present. What investigation is appropriate next?

Show answer & explanation

Correct answer: A - Perform a targeted Phase II assessment with sampling and testing.

Question 9

A newly designed parking facility contains 430 spaces. Under the 2010 ADA Standards, what is the minimum accessible-space count, including the minimum van-accessible portion?

Show answer & explanation

Correct answer: B - 9 accessible spaces, including 2 van spaces

Question 10

A project network uses finish-to-start logic: A takes 3 days; B and C follow A and take 5 and 4 days; D follows both B and C and takes 2 days. The contractor must shorten project completion by one day. B can be shortened one day for $2,000, C one day for $1,000, and D one day for $4,000. Which change is the least-cost option that actually shortens completion?

Show answer & explanation

Correct answer: A - Shorten B by one day for $2,000.

The rest of the CGC blueprint

The CGC exam also covers these domains. Drill them in the full free practice test:

That's 10 of 1,030

The full bank has 1,020 more CGC questions with explanations.

Continue in the free practice test →

View plans